Make a Difference


In this blog I hope to be able to provide the latest County news and happenings.
Along the right hand side of the blog are links to My Views on specific county issues.
Also included are links to my email, other county, state and federal representatives, and some interesting pictures and postcards from the past.

We need to hold all of our County representatives accountable in these difficult economic times.
Please support and comment on this blog and together we can make Cortland County a better place to live.
COMMUNICATION IS KEY!

Saturday, June 28, 2008

June Update - County Office Building Space Study

Barton and Loguidice /JCM Associates recently submitted the final CCOB space analysis. It was delivered on June 24. I am currently reviewing the data and hope to form a committee to begin laying out the master plan for the facility. Copies have been distributed to the entire Legislature.

We hope to couple the plan with the NYSERDA energy audit findings, and apply for funding to help offset renovation costs as we upgrade lighting and HVAC systems with more energy efficient technology.

Some of the alternatives being considered are the consolidation of the Mental Health facility on Clayton Avenue and the Horizon House on Grant Street into the COB. Both facilities were identified as undersized and poorly laid out for the services provided. Co-locating these departments with the Health Department should provide better services for the community and more efficient operations, saving taxpayers money.

The Horizon House facility is currently owned by Cortland County. The Mental Health building is currently leased through the end of 2010.

June Update - South Main Street


At the June Legislature session, a resolution was passed to begin design on a new Area Agency on Aging Office.

For those unaware with the function of the program - http://www.cortland-co.org/ofa/Default.htm

The space study performed by Barton and Loguidice and JCM Architectural Associates indicated that the Aging Offices was in need of more and better organized area. The optimal program would require approximately 17,300 square feet. This is approximately 35% more than the current program.

The resolution passed called for a two story, 22,400 square foot building with full basement (making the total building area 33,600 square feet). The Democratic caucus and debate on the floor during the vote led to an overall decision to proceed with the design of the building. The additional space at this point (more than 5,000 square feet) appears to be surge space to optimize building size on the site.

I voted to proceed with the building design, however I stressed that the building in its current orientation, siting and size may be subject to change based upon further Code review and development of the plan. I agreed that two or three options will be developed for selection by the Legislature in conjunction with the area residents. May largest concern was access to the parking lot, which is currently shown as two single one-way driving lanes: an entry lane from William Street and and exit lane to Randall Street. These details will be worked out as the project moves ahead.

I plan to form a subcommittee to work with the Aging Office, the consultants, and the neighborhood residents. I will be inviting members of the Concerned Citizens for Neighborhood Preservation to participate in the subcommittee meetings.

June Update - DMV


On Thursday, June 26 the Legislature voted to proceed with the design of a nominal 7500 square feet DMV and Board of Elections office on River Street. There were two other sizes of building considered at 6500 and 4000 square feet, respectively however the first vote passed to provide adequate space for the DMV, BOE office and storage of the new voting machines.

The new voting machines are scheduled to arrive in the immediate future, and they will be temporarily be stored at County owned or leased property until the permanent facility is completed. The machines require routine maintenance and testing, and must be contained in a temperature and humidity controlled environment with power connections to allow for the machines to function properly. That, combined with the fact the the BOE and DMV are both independent departments from the remainder of the County yet share Motor Voter registration was the reason I supported and voted for the 7500 square foot building option.

Moving the BOE out of the Cortland County Office Building is one of the first steps to renovate and upgrade the CCOB. At only 1000 square feet, their current space can be utilized for other departments as the master plan is developed and implemented.

I will be forming a sub-committee to work the the consultant, the County Clerk, Elections Office, County Planning and the area residents.

Wednesday, May 21, 2008

County Cost Savings Ideas - Health Insurance

This is an email I sent to the Health Committee on April 30-

I have spoken to several County employees who have interest in a mutual benefit with the County as it relates to Health insurance. As you are aware, the cost of Health insurance is ever-increasing and a considerable burden on the taxpayers. The 2008 budget for the County's Health, Dental and Vision Self-Insurance fund was more than $8.5 million.

I would like to request that the Health Committee review and discuss the impact an "opt out" for County Health insurance for County Employees who fit predetermined criteria and elect not to take coverage. I recommend that proof of alternate insurance be provided and kept on file, however this program could offer substantial savings to the County as well as a benefit to those with dual (spouse) health insurance coverage.

This has been done with success around the country; we may be able to realize some success by offering County employees an incentive to take their spouse's coverage, providing a nominal allowance ($150-$200 / month) to offset premiums for the alternate policy. In comparison, I believe that family coverage offered by the County is in the order of $10,000 per year - therefore each employee electing to "opt out" of health insurance could receive a $2,000 benefit, and provides the County an $8,000 savings. While this may seem insignificant, just 60 employees participating in the "opt out" could result in approximately $500,000 for the County; 120 could be $1 million.

Here are some links of municipalities which have enacted such a program, and sample forms:

http://www.nassaucountyny.gov/agencies/comptroller/smart_savings.html

http://www.apria.com/resources/1,2725,494-738919-1,00.html

http://www.co.walworth.wi.us/county%20board/website/Agendas-Minutes/Human%20Resources/2007-2008/Minutes/November%2013,%202007.pdf

http://www.talbotcountymd.gov/index.php?page=Benefits#health

http://www.co.pinellas.fl.us/persnl/benefits/health.htm

http://www.lbo.state.oh.us/123ga/fiscalnotes/123ga/HB0379HR.htm

http://www.spotsylvania.va.us/emplibrary/New%20Emp.%20Benefit%20FY2008.pdf

http://www2.co.multnomah.or.us/County_Management/Benefits/Forms%20&%20documents/Medical-Dental/Medical%20Opt%20Out%20Flyer.pdf


There is also a Shared Municipal Service Consortium Initiative (SMSI) grant program that we might want to consider finding out more about-

http://www.dos.state.ny.us/lgss/smsi/smsihealth06-07.html


The NYS OGS also has a link for a similar program.
http://www.osc.state.ny.us/localgov/costsavings/index.htm

Friday, May 16, 2008

May B&G Committee Update

DMV Building - Working on the preliminary design. Survey completed, soil sampling is being performed. Hope to have schematic design complete by early July, at which point we will have public review and comment.

South Main Street - Moose property has been purchased; closing on the Woods property is scheduled for around July 1. B&L and JCM Associates are working through the Area Agency on Aging Office feasibility study related to this area and are determining the space requirements for a new building. Study should be complete in June 2008. From the study, we will determine whether a new Aging office building will fit on South Main Street and how it would lay out.

NYSERDA energy study - Brian parker (B&G Superintendent) has been requested to find the status on our Cortland County Office Building Audit and will provide an update soon. This information will provide some direction on renovations to the CCOB and what kind of payback can be realized by better controlling our HVAC and lighting systems.

CCOB Study - Waiting for report from B&L / JCM Associates that can provide a County master plan for facilities. Should be forthcoming.

Preventative Maintenance plan - Scott Schrader and B&G have developed a list of planned/ preventative maintenance projects for County facilities. The list was provided to the B&G Committee at the March Committee meeting. a 5 year plan was drafted to take care of building needs, the proposed impact is approximately $150,000 per year. There is currently no plan for preventative maintenance of our facilities. By getting a line item in the budget we can minimize the impact of reacting to required repairs at a much higher cost than a prioritized, prepared plan. This plan will be discussed in the next few months, finalized and sent to the Budget and Finance Committee for consideration in the 2009 budget.

Crow deterrent machine - B&G has fabricated a skid for the portable device in preparation for the fall season. A use plan has been drafted and the device should be ready to deploy when needed. Thanks to Brian Parker for his efforts, the machine should work as effectively as the permanent system installed on the Courthouse. We hope to keep the thousands of crows at bay, and prevent the birds from roosting in the City trees and creating potential health hazards from their excrement.


Any feedback or suggestions is appreciated.